Wattey Energy (formerly BijliBachao.pk) is a Solar + Energy Automation Company based in Lahore, at NASTP, COLABS Cantt. Since 2018 our solar engineers have designed and installed solar for homes, businesses, industry and farms, and we are trusted by 80+ corporate clients. We don’t stop at installation: we maintain systems under an AMC from our own Network Operations Center, inspect them 24/7 with Wattey Solar Performance Cloud (Wattey SPC), and manage a site’s electricity with WattEY.
One company from the panel to the socket. From Solar Installation to Intelligent Energy Management.
Engineering-led solar for industrial, commercial, residential and agricultural sites in Lahore: load analysis, design and simulation, installation, testing and commissioning, and net-metering assistance.
Scheduled engineer visits, professional panel cleaning, fault rectification and a service report after every visit, run from our own Network Operations Center.
String-level, 24/7 solar inspection on any inverter brand, verified by solar engineers.
Monitor, control, automate and bill electricity across grid, solar, battery and generator.
Dust. Peer-reviewed measurements in Lahore found soiling losses of about 0.8% of output per day at typical panel tilt in the dry season, among the highest rates recorded anywhere (Ullah et al., Renewable Energy, 2020). Without regular cleaning, a Lahore system loses output every sunny day.
Peak hours. LESCO’s peak window is in the evening all year (5–9 PM in winter, 7–11 PM in summer), exactly when solar output fades. The savings come from using your own solar by day and moving flexible load out of the peak. See LESCO peak hours by month.
Net billing. New solar consumers are on net billing, where an exported unit earns far less than a unit you use yourself. A system that quietly underperforms now costs more, because you buy the missing units back at the full tariff.
Hidden faults. Across the solar Wattey SPC monitors, 61% of inverters had a dead string or went silent within 60 days while the owner’s app still showed a working plant (as of 25 August 2026).
Lahore Continental Hotel
WattEY: electricity monitoring and management
Gulberg 5t
WattEY: electricity monitoring and management
Rehma Hostel
WattEY Sub-Billing: fair per-resident billing, since October 2026
Lahore Cantonment Board
A Wattey Energy corporate client
More on our clients page.
How to choose a company, LESCO peak hours, why systems underperform, and what an industrial solar project includes.
Tell us about your home, business, factory or farm, and we’ll arrange a site survey.
Message us on WhatsApp